Chapter 8 Checklists Checklists 8.1 Guideway Checklist Guide rail locating surfaces are correctly prepared and cleaned Guide rail is correctly aligned to the locating side Screws are tightened using the correct torque Joints of multi-part guide rails are correctly aligned Parallelism tolerance is checked and meets specifications Running accuracy is checked and meets specifications Screw covers (plugs or cover strips) are correctly installed Carriage movement is smooth with no abnormal resistance Initial lubrication has been performed Wipers and additional wipers are correctly installed Front plates are correctly installed Push force is within the specified range 8.2 Measuring System Checklist Read head is correctly installed in the housing Air gap between read head and magnetic measuring tape is correct Electronics housing is correctly installed and secured Cables are correctly routed with no damage Cable bending radius meets specifications Power supply is connected and activated (AMSABS) LED status indicator shows normal Reference mark function is working correctly Measuring system output signal is normal Communication with the controller is working correctly Print Checklist Previous Chapter Chapter 7: Post-Installation Next Chapter Chapter 9-11: Maintenance